Business solutions · WEEE & IT assets

Manage equipment retirement. Not just its removal.

SJR supports IT, HSE, procurement and public-sector teams in handling end-of-use electrical, electronic and IT fleets and equipment batches.

End-to-end responsibility

Your equipment holds data and valuable resources.

The question is not only who can collect it. The batch must also be identified, secured, dismantled and routed. SJR defines the response around the equipment, volume, site and required evidence.

ANGED authorisation No. 21-2025

The official register covers collection, transport and recycling of WEEE and used catalysts, under the former name Société Dallagi de Récupération, through 18 August 2027 and within the published limits.

A structured service

Six dimensions of controlled IT and equipment retirement.

Each project is configured around real constraints. Stated operations and records match only the service scope actually agreed.

01 · SCOPING

Batch qualification

Categories, estimated volume, location, access, timing and confidentiality.

02 · LOGISTICS

Planned collection

Preparation, packing and pickup matched to the site and volume.

03 · ASSETS

Receipt and traceability

Batch creation, weighing and the agreed level of inventory detail.

04 · DATA

Media isolation

HDDs, SSDs and other media are separated from the material stream.

05 · WORKSHOP

Targeted dismantling

Separation of boards, metals, cables, plastics and specific components.

06 · OUTPUT

Documented routing

Relevant reuse, recoverable materials and fractions sent to suitable channels.

Sectors served

One chain. Different operational risks.

Service scope is adapted to equipment, site operations and information sensitivity. Every intervention remains subject to qualification.

SEC-01

IT & CIO teams

Computers, servers, networks, storage and peripherals leaving the fleet.

SEC-02

Banking & insurance

Identifiable assets and media requiring particular attention to data.

SEC-03

Industry

IT, electrical and electronic equipment from operations or maintenance.

SEC-04

Public sector

Decommissioned assets, inventoried batches and out-of-service equipment.

SEC-05

Telecom & networks

Communications equipment, cabling, boards and technical assemblies.

SEC-06

Retail & hospitality

Terminals, office equipment and renewed electrical infrastructure.

Evidence & deliverables

Define the evidence before moving the first asset.

The level of detail is agreed before collection and depends on the batch, risk and operations actually performed.

01

Collection record

Site, date, general batch type and agreed information.

02

Weight and batch makeup

Weighing data and grouping according to the chosen tracking scope.

03

Media treatment record

A record or certificate when destruction or sanitisation is included.

04

Routing summary

Operations performed and the route of key fractions, where available.

How it works

From request to operating record.

Easy to understand, precise to execute and proportional to risk.

Describe the batch

Equipment, volume, photos, location and potential data-bearing devices.

Approve the scenario

Scope, logistics, operations, documents and site-access conditions.

Collect and process

Pickup, receipt, sorting, security and fraction separation.

Deliver the evidence

Agreed records corresponding to the operations actually performed.

Planning an IT fleet retirement or multi-equipment collection?

Prepare the equipment types, estimated quantities, location, photos and confidentiality requirements.

Prepare the request